The water pump should be immersed in water for using. Install the pressure relief valve screw; pressure relief valve screw is installed at the pressure relief hole under the hose. The blow-down valve is installed at the. Drain outlet of the first air chamber block.
Immerse the water pump in water and switch on the power. Connect the container need to be inflated, make sure the connection is correct. Screw up the screws of the blow-down valve and pressure relief valve. Switch on the power ant the machine operates.
Note: when the machine is operating, the water must operate correspondingly, or the product might be damaged due to overheated, personal harm may even occur. After the inflation is completed, screw of the pressure relief valve should be firstly loosen, then the power is to be switched off, by doing so, high pressure. Air backlash caused due to sudden failure of power supply would be avoided, which could lengthen lifetime of the product, as well as discharge high pressure air in the machine. Please use the power supply according to the parameter table.If abnormal noise occurred during the using of the product, please stop using it instantly and check the cause. The product should be placed at a place that it couldn t be touched by children. Please do not use it in moist and flammable place. Please do not modify it arbitrarily, disassembling and repair by non-technical personnel is not allowed.
Make sure the socket could withstand a currentgreater than 8A before using it, or the circuit might be burnt, the product might be damaged and the dangers may be caused due to overload of the socket. Please do not touch the head section after the machine was just being used, so as to not beburnt by high temperature. Please do not leave without authorized, or the product might be damaged by increasingly rising pressure, sustained overload motor, even halt due to the operation pressure has reached but it is not turned off timely. When it is used for inflating slightly larger container, the cooling water should be changed every 30 minutes, in this way, the cylinder. Temperature could be better controlled.
The machine oil should be checked regularly, make sure the oil level is above the upper edge of the red point. If color of machine oil becomes dark and black, it should be changed in time. It takes 5 mins to fill full 0.45L tank to 4500PSI. It takes 12 mins to fill full 1L tank to 300 BAR. Our 30-day Satisfaction Guarantee assures our customers that they will receive all orders promptly and exactly as described. Used items will not be accepted for return. We will reply you ASAP. Our aim is to provide Top Level Customer Service, so we will try our best to solve any problem. The item "YONG110V 30MPa 4500PSI HENG Air Compressor Pump PCP Electric High Pressure Rifle" is in sale since Wednesday, December 23, 2020. This item is in the category "Business & Industrial\Hydraulics, Pneumatics, Pumps & Plumbing\Pumps & Pump Accessories\Other Pumps". The seller is "huayellow_65" and is located in Monroe Township, New Jersey. This item can be shipped to United States.